On a not quite so cold morning we had another excellent pick at Dunsley Road.
With Doug’s considerable help we had to try something different to get the rubbish deposited down the bank along the pathway that leads to Ridgewood School, which was by using Doug’s ropes to abseil down to it then using the same ropes to bring the rubbish up.
Please see photos below (including before and after) of our operation performed by Doug, Dave and Dawn, Rachael, Tony, Helen and Roger. We also tidied-up near the back gates to the school and in total collected 12 large bags of rubbish, a deck chair, plastic chair, a compost bin (which Dave took for his garden), motor cycle wheel, kids bike and garden ornament



